Compliance auditISO 10012:2026

ISO 10012:2026 — Measurement management systems

Requirements for a measurement management system ensuring the validity and reliability of measurement results in support of the conformity of products and services; applicable to any organization (harmonized structure).

control points
81
anchored clauses
44
Clauses covered
11

Clauses covered

Context of the organization (clause 4)44.1 · 4.2 · 4.3 · 4.4
Leadership (clause 5)45.1 · 5.2 · 5.3 · 5.4
Planning (clause 6)36.1 · 6.2 · 6.3
Support (clause 7)87.1.3 · 7.1.4 · 7.1.5 · 7.1.1-7.1.2 · 7.2 · 7.3 · 7.4 · 7.5
Operation — planning and requirements of measurement processes (8.1-8.2)48.1.1 · 8.1.2 · 8.2.2-8.2.3 · 8.2.4-8.2.5
Operation — design and development of measurement processes (8.3)58.3.3 · 8.3.4 · 8.3.5 · 8.3.6 · 8.3.1-8.3.2
Operation — control of outsourced processes (8.4)38.4.1 · 8.4.2 · 8.4.3
Operation — implementation of measurement processes (8.5)68.5.1.1 · 8.5.1.2 · 8.5.1.3 · 8.5.2 · 8.5.3 · 8.5.4-8.5.6
Operation — release of results and nonconforming outputs (8.6-8.7)28.6 · 8.7
Performance evaluation (clause 9)39.1 · 9.2 · 9.3
Improvement (clause 10)210.1 · 10.2

Scale

CompliantOpportunity for improvementNon-compliantNot applicable

This template is used inside the platform: every finding becomes a corrective action tracked through to its evidence — something a printed grid cannot do.

Use this template

14-day trial, no credit card. The template opens in your workspace.

How this grid is built

Every control point is written in our own words, then tied to the standard's clause number. The normative text is never reproduced: the standard itself remains to be purchased from the body that publishes it. Grids are reviewed at every new edition of a standard.

Published by NormePulse — HEMC, management consulting firmUpdated

Related templates