Site survey — point-to-point wireless link
Site survey for a point-to-point radio link (Wi-Fi/wireless): customer details, GPS readings of the base and remote sites, repeatable record of obstacles along the path (Fresnel zone clearance), power supply and cabling, radio regulatory constraints (power, frequency), logistics, communication means and authorisations. Measurement fields and Yes / No / N/A checks to ensure the quality of the information passed to the installation team. Repeatable "Obstacle" section. Generic template.
- control points
- 60
- anchored clauses
- 0
- Clauses covered
- 2
Clauses covered
| Power supply & cables | 7 | |
| Logistics, communications & authorisations | 8 |
Scale
This template is used inside the platform: every finding becomes a corrective action tracked through to its evidence — something a printed grid cannot do.
Use this template14-day trial, no credit card. The template opens in your workspace.
How this grid is built
Every control point is written in our own words, then tied to the standard's clause number. The normative text is never reproduced: the standard itself remains to be purchased from the body that publishes it. Grids are reviewed at every new edition of a standard.
Published by NormePulse — HEMC, management consulting firmUpdated
Related templates
- ISMS audit — Annex A controls (ISO/IEC 27001:2022)100 control points
- Installation quality check — microwave link (antenna / ODU / IF / IDU)37 control points
- ISO/IEC 22237-2:2024 — Data centres: building construction109 control points
- ISO/IEC 22237-6:2024 — Data centres: security systems (physical security)60 control points